Ordering party: Sigma-Woltaika
Period of implementation: 2014 – 2015
Scope of works:
- the development of design and executive documentation for: MV connection, the transformer station, telemechanics and measurement systems,
- construction of an overhead cable connection,
- delivery and assembly of the transformer station,
- commissioning of the transformer station and the telemechanics transmission and measurement systems,
- the development of as-built documentation as well as operation and maintenance instructions along with arrangements with the distribution system operator.
