The building-up of a 110 kV switchgear in the 110 / 15kV GPZ Piotrowiec substation

The building-up of a 110 kV switchgear in the 110 / 15kV GPZ Piotrowiec substation for the connection of the “Tolkowiec” Wind Farm with the connection capacity of 48,000kW. Ordering party: Energa Operator S.A. Period of implementation: 2014 Scope of works: modernization of a 110 kV switch station consisting in the replacement of switching devices with structures…

Pfleiderer Grajewo

Installation for the construction of a new wet filter at the Plates Factory in Grajewo. Scope of work: execution of energy and technological cable routes, wiring installation, connection of technological cabinets and receivers, as-built measurements, I/O tests, as-built documentation.

British American Tobacco

Scope of works: delivery and assembly of a complete prefabricated building of the main distribution station with a multi-buy MV switchgear, delivery and assembly of the complete Kormoran substation equipped with a 3-bay medium voltage switchgear, the building-up of medium and low voltage lines related to the construction of the main distribution station and the…

Construction of lighting on Świętokrzyska Street

In the section from Antoniukowska street to Gen. Z. Berlinga street in Białystok along with the construction of technical infrastructure. Ordering Party: Unibep S.A. Implementation period:  2012- 2013 Scope of work: construction of traffic lights at the crossing of Świętokrzyska and Berlinga street, construction of traffic lights at the crossing of ul. Świętokrzyska and Sitarska street,…

The equipping of the Legionowo HV / MV station with a telemechanics facility controller

The equipping of the Legionowo HV / MV station with a telemechanics object controller with reference to the station circuits, activation of connections and communication with the dispatching system. Ordering party: PGE Dystrybucja S.A. Period of implementation: 2014 Scope of works: the development of executive documentation for replacement of protections in 110kV switching station, the replacement of…

PGE Further follow-up compensation systems for PGE

The modernization and construction of new follow-up compensation units in 110 / 15kV stations have been completed. Elektromontaż Wschód was responsible for construction and detailed designs, as well as modernization and construction of new turnkey follow-up compensation units along with the modernization of MV bays at the Czyżew and Ciechanowice stations. In Czyżewo, two stations…