Turośń 0.5 MW solar farm

Ordering party: MIWO Period of implementation:  2014 – 2015 Number of modules: 2000 items Scope of works: development of a construction design along with obtaining a final decision in the field of PnB, construction of a MV cable line with a connection to an overhead line, delivery, assembly and commissioning of a MV / LV transformer station…

Iława ind farm 12 MW

Ordering Party: STEAG GmbH, Germany Implementation period:  2013 – 2014 Scope of work: development of executive documentation, construction of access roads and maneuvering areas, construction of foundations for wind turbine towers, supervision over assembly of Vestas V112-3MW wind turbines, construction of MV cable lines, construction of a fiber optical network, assembly and commissioning of the R-SN-KOMPENSACJA…

1.5 MW photovoltaic farms (Łazy 621, Łazy 625, Wólka 520)

Ordering party: Sigma-Woltaika Period of implementation:  2014 – 2015 Scope of works: the development of design and executive documentation for: MV connection, the transformer station, telemechanics and measurement systems, construction of an overhead cable connection, delivery and assembly of the transformer station, commissioning of the transformer station and the telemechanics transmission and measurement systems, the development…

Electrical installation works in the building of the OSM cooling engine room in Piątnica

Ordering party: Okręgowa Spółdzielnia Mleczarska w Piątnicy Period of implementation: 2013 Scope of works: project development for the adaptation of devices and circuits of 15kV switchgear, installation of 3 two-core voltage transformers, the replacement of existing current transformers with three-core transformers, the disassembly of existing circuit breaker, the installation of a new circuit breaker in a stationary…