Double-circuit 110kV overhead line for TAURON

At the request of TAURON, Elektromontaż Wschód will rebuild the double-circuit 110 kV overhead line into single-track lines (overhead and underground) from the pylons to the Ząbkowice GPZ. The scope of work includes: a) reconstruction of the 110 kV S-293 overhead line, b) reconstruction of the 110 kV S-208 overhead line, including the construction of…

1 MWp PV Wola Dubowska

Elektromontaż Wschód is engaged in the comprehensive construction of a photovoltaic plant with additional infrastructure in Wola Dubowska in the Lubelskie Voivodeship. The installed power of the plant is 1MWp. To achieve the intended power, 1848 PV panels with a capacity of 520 Wp each will be installed. The farm will be put into operation…

Photovoltaic Plant Chwiram 1MW

Elmont Grupa was chosen by the Investor as the General Contractor of a 1 MWp Photovoltaic Plant with the necessary technical infrastructure in Zachodniopomorskie Voivodeship. The project aims to implement, commissioning and putting into operation a photovoltaic farm, which will consist of over 3,000 stand-alone photovoltaic modules with DC inverters mounted on racks with the…

Substation 400kV Łomża Systemowa PSE

On behalf of Polskie Sieci Elektroenergetyczne S.A. Elektromontaż Wschód deals with the removal of errors and modernization of the Substation Łomża Systemowa, which was implemented as part of the “Poland-Lithuania power connection” project. The scope of work includes primary and secondary circuits as well as general construction works. The implementation period is 18.03 – 18.12.2021.…