Ordering party: Waterworks Białystok
Period of implementation: from 2021 to 2022.
Number of modules: 2624 pieces
Scope of work:
- development of a construction design along with obtaining a final decision in the field of PnB,
- special load-bearing beams made on clean water tanks on which the panel structure was placed,
- installation of 22 inverters with DC and AC cabling,
- execution of 9 cable connectors supplying RPV1 and RPV 2 switchgears,
- assembly of 2 AC switchgears supplying sections I and II WB,
- installation of MV voltage transformers,
- execution of a SCADA system for the Investor’s internal network.