Photovoltaic Farm

60MW photovoltaic farm in design&build formula

We are pleased to announce the new Elmont contract for the design and construction of a large photovoltaic farm with a capacity of 60 MW for a foreign investor. The works will include the implementation of the following: replacement of construction and building project as well as building a photovoltaic farm. The scope of work…

Photovoltaic Farm Lubno

PV Lubno 5MW for ENEA

Elmont, together with design studio Enspro, will design and build 5MW Lubno photovoltaic farm for ENEA Nowa Energia in the formula: „design&build”. The scope of work includes preparation of replacement design, building designs and construction of a new 5MW photovoltaic farm. As part of the project, we will also make 15 kV cable outlets and connect…

PV farm

Solar 100 MW with GPO Substation

Elmont Grupa participates in the implementation of another, one of the largest photovoltaic farms in Poland with a total capacity of 100 MWp. The production of this power plant at the level of about 100 thousand MWh will allow to meet the demand  for electricity of more than 40 thousand households. Our design studio Enspro…

RS 110 kV Różyna already under voltage!

Elmont energized the RS 110 kV Różyna, which will allow the introduction of the power generated by the Sępopol Wind Farm to the ENERGA Operator power system. Currently, thanks to connecting the voltage to the switch station, the process of commissioning individual wind turbines is in progress.

110kV HV and RS Czuby lines

Elmont, as part of the nationwide project MUZA IV, will build a high-voltage cable line from RS Czuby to PT Motycz and the RS Czuby network switch station with a voltage of 110 kV. The project will also cover the preparation of accompanying infrastructure. This is one of the many tasks carried out by our…

Another 14 MW from wind

At the order of a foreign RES investor, Elmont will build wind farms in the BoP formula. The contract covers the comprehensive execution of road infrastructure, maneuvering areas, turbine foundations, MV substations with reactive power compensation systems, and over 50 km of cables to be connected to the DSO network. It is another investment carried…

Substation 220/110kV GPZ Abramowice

Elmont Grupa will design and build a new 110 kV switch station in GIS technology, replacing the currently working and worn-out switch station in AIS technology. The scope of work includes preparing a building design, execution designs, and construction with all procurements, including a new indoor two-system 18-bay switchgear in GIS 110 kV technology. As part…

Elektromontaż Wschód = Elmont!

From 11-th of March 2022, we cut the name & shorten the montage ! Elektromontaż Wschód, the largest company in the Elmont Group, has been operating on the Polish market for almost 30 years. It is inextricably linked with the history of the energy industry in Poland. Elektromontaż took part in the construction of the…

Wind Farm Banie III and IV 137.4 MW

The Elmont Group continues the implementation of subsequent stages of the Banie Wind Farm with a total capacity of 137.4 MW (stage III – 81.4 MW; stage IV – 56 MW). Currently, we are implementing the infrastructure of the Banie IV Wind Farm for the needs of 16 wind turbines, each with a capacity of…