Modernization of the PT Ełk substation
Modernization of the e PT Ełk substation.
Modernization of the e PT Ełk substation.
Ordering Party: PGE Klaster Sp. z o.o. Period of implementation: 2019 Scope of work: preparation of construction and executive as well as design documentation as agreed with the ordering party, comprehensive construction and electrical works in connection with the construction of a 110 kV cable line with an optical fibre line, comprehensive construction and electrical works in…
The construction of a MV cable line with a fibre optic control line in Białystok to control the transmission of electricity with a MV cable connector and a fibre optic cable tray. Ordering party: PGE Dystrybucja S.A. Branch in Białystok Period of implementation: 2012 Scope of works: construction of MV power cable line, construction of a fibre…
Ordering part: PGE Dystrybucja S.A. Branch Białystok Period of implementation: 2016 Scope of works: the development of construction and executive as well as design documentation as agreed with the ordering party, obtaining a valid building permit, the construction of the HV 110 kV cable line, the replacement of existing poles with 110 kV cable poles, the assembly…
Ordering party: PGE Dystrybucja S.A. Period of implementation: 2010 Scope of works: construction of a switchgear, routing of a cable junction, construction of two TR 800 kVA transformers, power generator installation.
Ordering party: PGE Dystrybucja S.A. Branch Białystok Period of implementation: 2016 – 2018 Scope of works: primary circuits, architectural and construction part, construction and building part, energy measurements, 110kV secondary circuits, the modernization of the 15kV switch station, telemechanics, for own needs, SAP and IDS systems, sanitary installations, roads and topography, water supply connection, communication.
Ordering party: PGE Dystrybucja S.A. Period of implementation: 2014 Scope of works: execution of construction and assembly works, configuring and starting the protection relay communication, calculating and entering the settings into the protection relay, carrying out functional tests of telemechanics from the local level and from the central dispatch supervision system and the communication in the engineering…
Ordering Party: PGE Dystrybucja S.A. Oddział Białystok Implementation period: 2015 Scope of work: updating technical documentation for security communication in the engineering channel, execution of a complete station telemechanics system in accordance with the updated technical documentation, delivery of materials and equipment as well as all related configuration and commissioning works, calculation and introduction of EAZ settings…
Ordering party: STRABAG Sp. z o.o. Period of implementation: 2014 Scope of works: rebuilding of LV and MV power lines and devices, construction and rebuilding of street lighting, disassembly works related to traffic lights.
The building-up of a 110 kV switchgear in the 110 / 15kV GPZ Piotrowiec substation for the connection of the “Tolkowiec” Wind Farm with the connection capacity of 48,000kW. Ordering party: Energa Operator S.A. Period of implementation: 2014 Scope of works: modernization of a 110 kV switch station consisting in the replacement of switching devices with structures…