Chotków Photovoltaic Farm 40 MW

Farma fotowoltaiczna Elmont Grupa

The Elmont will build a 40 MW photovoltaic farm in the Chotków turnkey formula for a foreign investor.

As part of the project, electricity will be led out of the farm via a 30 kV cable connection to the GPO 110/30kV Chotków substation we are building.
The photovoltaic power plant under construction will contain a total of over 61,000 modules, each with a power of 650 Wp, arranged on tables in a vertical arrangement on metal supporting structures.

The deadline for commissioning the investment is the second quarter of 2023.

Share

See more

Photovoltaic farms

A 40MW photovoltaic farm in western Poland

Elmont, commissioned by a foreign investor, started the construction of a turnkey photovoltaic farm with a capacity of 40 MWp in western Poland. The farm

Energy infrastructure

Energy Storage 400 MWh

Enspro will carry ou the project, obtaining a permit for the construction of the HEP2 Battery Electricity Storage with a capacity of 200MW and a

Farma fotowoltaiczna Elmont
Photovoltaic farms

20 MW PV farm

Elmont is starting the construction of its next high-power photovoltaic farm. This time, at the request of a foreign investor in the Design and Build

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top