GPZ 110 / 15kV Radzikowice for TAURON

Elmont Grupa – Infrastruktura Energetyczna

The construction of the 110 / 15kV Radzikowice substation in the Nysa municipality in the “design and build” formula is carried out by a consortium of companies from the Elmont Group. The design of the station was made by the Enspro design studio, which had previously designed for Tauron Dystrybucja. Elektromontaż Wschód, the consortium leader, is carrying out other works. These works include, among others, AIS 14-bay double-system HV switchgear and 30-bay MV switchgear, which are already being completed.

The facility will supply business entities that will be located in the Wałbrzych Special Economic Zone in Radzikowice, in the Nysa municipality, in the Opolskie Voivodeship.

Share

See more

Photovoltaic farms

A 40MW photovoltaic farm in western Poland

Elmont, commissioned by a foreign investor, started the construction of a turnkey photovoltaic farm with a capacity of 40 MWp in western Poland. The farm

Energy infrastructure

Energy Storage 400 MWh

Enspro will carry ou the project, obtaining a permit for the construction of the HEP2 Battery Electricity Storage with a capacity of 200MW and a

Farma fotowoltaiczna Elmont
Photovoltaic farms

20 MW PV farm

Elmont is starting the construction of its next high-power photovoltaic farm. This time, at the request of a foreign investor in the Design and Build

See our projects