HYpacts for PGE in Dylewo!

Elmont Grupa – Infrastruktura Energetyczna

We are pleased to announce that the project of rebuilding the existing power station for PGE in Dylewo, implemented by Elmont Grupa, has reached another important stage.

As the Elmont Group, we closely follow the latest technological solutions. All this to offer our clients services at the highest, world-class level. And just such a solution, we have recently delivered and installed HYpacts in Dylewo. But what exactly is HYpact? In a nutshell, it is a hybrid compact switchgear containing elements in SF6 insulation and air insulation.

Saving space and costs are just two of the many advantages of this solution – HYpact switchgear is also much more resistant to environmental factors and enables the use of innovative, optimized design solutions for power substations.

Share

See more

Photovoltaic farms

A 40MW photovoltaic farm in western Poland

Elmont, commissioned by a foreign investor, started the construction of a turnkey photovoltaic farm with a capacity of 40 MWp in western Poland. The farm

Energy infrastructure

Energy Storage 400 MWh

Enspro will carry ou the project, obtaining a permit for the construction of the HEP2 Battery Electricity Storage with a capacity of 200MW and a

Farma fotowoltaiczna Elmont
Photovoltaic farms

20 MW PV farm

Elmont is starting the construction of its next high-power photovoltaic farm. This time, at the request of a foreign investor in the Design and Build

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top