Modernization of the 110 kV Suwałki HV line

Elmont Grupa – Infrastruktura Energetyczna

Ordering part: PGE Dystrybucja S.A. Branch Białystok

Period of implementation: 2016

Scope of works:

  • the development of construction and executive as well as design documentation as agreed with the ordering party,
  • obtaining a valid building permit,
  • the construction of the HV 110 kV cable line,
  • the replacement of existing poles with 110 kV cable poles,
  • the assembly of 110 kV cable terminations,
  • disassembly of 110 kV poles,
  • the measurements of the HV 110kV line and as-built documentation.

Share

See more

Photovoltaic farms

A 40MW photovoltaic farm in western Poland

Elmont, commissioned by a foreign investor, started the construction of a turnkey photovoltaic farm with a capacity of 40 MWp in western Poland. The farm

Energy infrastructure

Energy Storage 400 MWh

Enspro will carry ou the project, obtaining a permit for the construction of the HEP2 Battery Electricity Storage with a capacity of 200MW and a

Farma fotowoltaiczna Elmont
Photovoltaic farms

20 MW PV farm

Elmont is starting the construction of its next high-power photovoltaic farm. This time, at the request of a foreign investor in the Design and Build

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top