Wind Farm Chodzież – all works completed!

We are pleased to announce that the Chodzież wind farm has started with full power. 4 Vestas V100 turbines with a capacity of 2MW at a height of 120m already generate electricity. We signed the acceptance report with the Investor and handed over the facility for operation. We are currently at the last stage –…

read more

Power evacuation and construction of power infrastructure for the wind farm complex PGE KLASTER with a capacity of 88 MW

Ordering Party: PGE Klaster Sp. z o.o. Period of implementation: 2019 Scope of work: preparation of construction and executive as well as design documentation as agreed with the ordering party, comprehensive construction and electrical works in connection with the construction of a 110 kV cable line with an optical fibre line, comprehensive construction and electrical works in…

read more

Turośń 0.5 MW solar farm

Ordering party: MIWO Period of implementation:  2014 – 2015 Number of modules: 2000 items Scope of works: development of a construction design along with obtaining a final decision in the field of PnB, construction of a MV cable line with a connection to an overhead line, delivery, assembly and commissioning of a MV / LV transformer station…

read more

Iława ind farm 12 MW

Ordering Party: STEAG GmbH, Germany Implementation period:  2013 – 2014 Scope of work: development of executive documentation, construction of access roads and maneuvering areas, construction of foundations for wind turbine towers, supervision over assembly of Vestas V112-3MW wind turbines, construction of MV cable lines, construction of a fiber optical network, assembly and commissioning of the R-SN-KOMPENSACJA…

read more

1.5 MW photovoltaic farms (Łazy 621, Łazy 625, Wólka 520)

Ordering party: Sigma-Woltaika Period of implementation:  2014 – 2015 Scope of works: the development of design and executive documentation for: MV connection, the transformer station, telemechanics and measurement systems, construction of an overhead cable connection, delivery and assembly of the transformer station, commissioning of the transformer station and the telemechanics transmission and measurement systems, the development…

read more

Parsówek wind farm 26 MW

Ordering Party: ENERGA Invest S.A. Implementation period: 2015 Scope of work: preparation of detailed designs for all industries (road, construction, electrical), construction of a 110 kV line bay at the Kołbacz Main Supply Point, introducing power to the Kołbacz Main Supply Point by means of a 110 kV overhead cable line with a fiber optical line and…

read more

Zajdy Biogas Plant

Ordering party: Ekowood Sp. z o.o. Period of implementation:  2013 – 2014 Scope of works: MV overhead connection of the biogas plant to the supply network, construction of MV cable line, the assembly and commissioning of a container transformer station with green energy measurement systems, the construction of a power supply network for technological devices, the…

read more

Miksztal 10 MW wind farm

Ordering party: Alstal Construction Group Period of implementation:  2014- 2015 Scope of works: the delivery, construction and commissioning of MV cable lines with technical infrastructure, the delivery, construction and commissioning of fibre optic cable lines along with technical infrastructure, connecting the wind farm to the NPS along with the procedure carried out before the distribution system…

read more

Giże Biogas Plant

Biogas plant with a capacity of 1.063 MW in Zajdy near Olecko, Warmian-Masurian Voivodeship. Ordering party: Eco-Progres Sp. z o.o. Period of implementation:  2013 – 2014 Scope of works: MV overhead connection of the biogas plant to the supply network, construction of a MV cable line, the assembly and commissioning of a container transformer station…

read more