Power evacuation and construction of power infrastructure for the wind farm complex PGE KLASTER with a capacity of 88 MW

Ordering Party: PGE Klaster Sp. z o.o. Period of implementation: 2019 Scope of work: preparation of construction and executive as well as design documentation as agreed with the ordering party, comprehensive construction and electrical works in connection with the construction of a 110 kV cable line with an optical fibre line, comprehensive construction and electrical works in…

read more

Turośń 0.5 MW solar farm

Ordering party: MIWO Period of implementation:  2014 – 2015 Number of modules: 2000 items Scope of works: development of a construction design along with obtaining a final decision in the field of PnB, construction of a MV cable line with a connection to an overhead line, delivery, assembly and commissioning of a MV / LV transformer station…

read more

Construction of a MV cable line with a fibre optic control line in Białystok

The construction of a MV cable line with a fibre optic control line in Białystok to control the transmission of electricity with a MV cable connector and a fibre optic cable tray. Ordering party: PGE Dystrybucja S.A. Branch in Białystok Period of implementation: 2012 Scope of works: construction of MV power cable line, construction of a fibre…

read more

UT-H Ultrathin Furniture Boards Factory

As a general contractor of electrical power works at the direct request of the Investor, we designed and implemented the structure of electricity distribution and distribution for the needs of the most modern factory producing ultra-thin HDF boards. It took less than a year to build the factory from scratch. The area of the facility…

read more

1.5 MW photovoltaic farms (Łazy 621, Łazy 625, Wólka 520)

Ordering party: Sigma-Woltaika Period of implementation:  2014 – 2015 Scope of works: the development of design and executive documentation for: MV connection, the transformer station, telemechanics and measurement systems, construction of an overhead cable connection, delivery and assembly of the transformer station, commissioning of the transformer station and the telemechanics transmission and measurement systems, the development…

read more

Electrical installation works in the building of the OSM cooling engine room in Piątnica

Ordering party: Okręgowa Spółdzielnia Mleczarska w Piątnicy Period of implementation: 2013 Scope of works: project development for the adaptation of devices and circuits of 15kV switchgear, installation of 3 two-core voltage transformers, the replacement of existing current transformers with three-core transformers, the disassembly of existing circuit breaker, the installation of a new circuit breaker in a stationary…

read more

Modernization of the 110 kV Suwałki HV line

Ordering part: PGE Dystrybucja S.A. Branch Białystok Period of implementation: 2016 Scope of works: the development of construction and executive as well as design documentation as agreed with the ordering party, obtaining a valid building permit, the construction of the HV 110 kV cable line, the replacement of existing poles with 110 kV cable poles, the assembly…