PT 110kV Czachówek Elmont

Traction substation 110kV Czachówek is already operational

The Elmont designed and built the Czachówek traction substation. The investment included multi-discipline works, in particular power engineering. The following elements were made: building structure, reinforced concrete structures, steel structures, heating, ventilation, internal and external water and sewage installations, roads, squares, sidewalks and fencing of the area. The facility’s technological equipment included rectifier units, 15kV…

read more

Wind Farm Chodzież – all works completed!

We are pleased to announce that the Chodzież wind farm has started with full power. 4 Vestas V100 turbines with a capacity of 2MW at a height of 120m already generate electricity. We signed the acceptance report with the Investor and handed over the facility for operation. We are currently at the last stage –…

read more
Augustynka

RS 110 kV Augustynka for PGE

The Elmont Grup is implementing another project related to photovoltaics. For the purposes of connecting the Augustynka 1 photovoltaic power plant with a capacity of 25 MW, we prepare technical documentation together with obtaining the necessary formal and legal decisions. Next, we will carry out construction and assembly works related to the construction of a…

read more

Modernization Main Source of Suply Wyszków 110/15kV

The Elmont, commissioned by PGE, will carry out a comprehensive modernization and extension of the 110/15 kV Wyszków power station along with HV and MV cable lines and accompanying infrastructure in Turzyn, Brańszczyk commune. The reconstruction Main Source od Suply is related to the strategic investment carried out in the neighborhood by Polskie Sieci Elektroenergetyczne,…

read more

Power evacuation and construction of power infrastructure for the wind farm complex PGE KLASTER with a capacity of 88 MW

Ordering Party: PGE Klaster Sp. z o.o. Period of implementation: 2019 Scope of work: preparation of construction and executive as well as design documentation as agreed with the ordering party, comprehensive construction and electrical works in connection with the construction of a 110 kV cable line with an optical fibre line, comprehensive construction and electrical works in…

read more

Turośń 0.5 MW solar farm

Ordering party: MIWO Period of implementation:  2014 – 2015 Number of modules: 2000 items Scope of works: development of a construction design along with obtaining a final decision in the field of PnB, construction of a MV cable line with a connection to an overhead line, delivery, assembly and commissioning of a MV / LV transformer station…

read more

Construction of a MV cable line with a fibre optic control line in Białystok

The construction of a MV cable line with a fibre optic control line in Białystok to control the transmission of electricity with a MV cable connector and a fibre optic cable tray. Ordering party: PGE Dystrybucja S.A. Branch in Białystok Period of implementation: 2012 Scope of works: construction of MV power cable line, construction of a fibre…

read more

UT-H Ultrathin Furniture Boards Factory

As a general contractor of electrical power works at the direct request of the Investor, we designed and implemented the structure of electricity distribution and distribution for the needs of the most modern factory producing ultra-thin HDF boards. It took less than a year to build the factory from scratch. The area of the facility…

read more