Substation 220/110kV GPZ Abramowice

Elmont Grupa – Infrastruktura Energetyczna

Elmont Grupa will design and build a new 110 kV switch station in GIS technology, replacing the currently working and worn-out switch station in AIS technology. The scope of work includes preparing a building design, execution designs, and construction with all procurements, including a new indoor two-system 18-bay switchgear in GIS 110 kV technology. As part of the contract, we will also implement a 110 kV cable line with a total length of over 8 km, all secondary circuits, including Substation Control System (SCS), telecommunications, protection automation system (PAS), technical protection systems (TPS), etc.

The Abramowice station is a 220/110 kV substation shared between PSE S.A. and PGE Dystrybucja S.A. The investment concerns the part belonging to PGE Dystrybucja S.A. However, because the stations are shared, Elmont will also do some works in the technical infrastructure of PSE S.A. The deadline for putting the new switch station into use is the end of June 2023. The value of the signed contract is nearly PLN 57 million. 

Share

See more

Farma fotowoltaiczna Elmont
Photovoltaic farms

20 MW PV farm

Elmont is starting the construction of its next high-power photovoltaic farm. This time, at the request of a foreign investor in the Design and Build

Energy infrastructure

New GIS 110kV for EON

Consortium of companies Elmont Sp. z o. o. and Pracownia Projektowa Enspro Sp. z o. o. will develop executive documentation and build a 110 kV

Photovoltaic farms

Photovoltaic farms with a total capacity 4MW

Elmont, together with Pracownia Projektowa Enspro, will design and build photovoltaic farms with a total capacity of 4 MW.The scope of work includes the preparation