Substation 400kV Łomża Systemowa PSE

Elmont Grupa – Infrastruktura Energetyczna

On behalf of Polskie Sieci Elektroenergetyczne S.A. Elektromontaż Wschód deals with the removal of errors and modernization of the Substation Łomża Systemowa, which was implemented as part of the “Poland-Lithuania power connection” project.

The scope of work includes primary and secondary circuits as well as general construction works.

The implementation period is 18.03 – 18.12.2021.

The choice of Elektromontaż Wschód as the contractor for the project was influenced by our image of a proven professional who can be entrusted with the implementation of the most demanding and advanced engineering works.

Share

See more

Photovoltaic farms

A 40MW photovoltaic farm in western Poland

Elmont, commissioned by a foreign investor, started the construction of a turnkey photovoltaic farm with a capacity of 40 MWp in western Poland. The farm

Energy infrastructure

Energy Storage 400 MWh

Enspro will carry ou the project, obtaining a permit for the construction of the HEP2 Battery Electricity Storage with a capacity of 200MW and a

Farma fotowoltaiczna Elmont
Photovoltaic farms

20 MW PV farm

Elmont is starting the construction of its next high-power photovoltaic farm. This time, at the request of a foreign investor in the Design and Build

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top