The building-up of a 110 kV switchgear in the 110 / 15kV GPZ Piotrowiec substation

Elmont Grupa – Infrastruktura Energetyczna

The building-up of a 110 kV switchgear in the 110 / 15kV GPZ Piotrowiec substation for the connection of the “Tolkowiec” Wind Farm with the connection capacity of 48,000kW.

Ordering party: Energa Operator S.A.

Period of implementation: 2014

Scope of works:

  • modernization of a 110 kV switch station consisting in the replacement of switching devices with structures and foundations,
  • replacement of secondary circuits of 110 kV switch station devices,
  • the replacement of overhead busbars in 110 kV switching stations,
  • equipping the 110 kV switching station with a 48 MW wind farm connection station,
  • the equipping of power line inputs at Piotrowiec, Braniewo and Orneta stations with differential protections along with their configuration and commissioning,
  • the disposal of disassembled devices,
  • the updating of operating instructions for modernized stations,
  • the updating of executive design for the development of signalling lists for telemechanics facilities.

Share

See more

Photovoltaic farms

A 40MW photovoltaic farm in western Poland

Elmont, commissioned by a foreign investor, started the construction of a turnkey photovoltaic farm with a capacity of 40 MWp in western Poland. The farm

Energy infrastructure

Energy Storage 400 MWh

Enspro will carry ou the project, obtaining a permit for the construction of the HEP2 Battery Electricity Storage with a capacity of 200MW and a

Farma fotowoltaiczna Elmont
Photovoltaic farms

20 MW PV farm

Elmont is starting the construction of its next high-power photovoltaic farm. This time, at the request of a foreign investor in the Design and Build

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top