Ordering party: MIWO
Period of implementation: 2014 – 2015
Number of modules: 2000 items
Scope of works:
- development of a construction design along with obtaining a final decision in the field of PnB,
- construction of a MV cable line with a connection to an overhead line,
- delivery, assembly and commissioning of a MV / LV transformer station with a billing system,
- construction of LV cable lines,
- delivery and assembly of a supporting structure for the assembly of photovoltaic panels with the assembly of panels and string wiring,
- delivery, assembly and connection of inverters and cable connectors,
- connecting the power plant to the national electronic system along with carrying out the acceptance procedure before the distribution system operator,
- development of as-built documentation as well as operation and maintenance instructions with arrangements with the distribution system operator,
- obtaining a permit to use the power plant.