We are building the SmartGrid network

Elmont Grupa – Infrastruktura Energetyczna

On September 27, 2019, a contract was signed for the construction of a smart power grid in the city of Szczecin, Gryfino County and the city of Świnoujście. The investor is ENEA Operator Sp. z o.o.

Under the contract, Elektromontaż Wschód will modernize and rebuild MV / LV stations and MV / MV network switching stations, automate lines and stations as a result of remote control of electrical power protection automation, including short-circuit current flow indicators.

The scope of works also includes the preparation of design documentation and construction works.

The deadline for the work is set at the end of 2021.

Share

See more

Photovoltaic farms

A 40MW photovoltaic farm in western Poland

Elmont, commissioned by a foreign investor, started the construction of a turnkey photovoltaic farm with a capacity of 40 MWp in western Poland. The farm

Energy infrastructure

Energy Storage 400 MWh

Enspro will carry ou the project, obtaining a permit for the construction of the HEP2 Battery Electricity Storage with a capacity of 200MW and a

Farma fotowoltaiczna Elmont
Photovoltaic farms

20 MW PV farm

Elmont is starting the construction of its next high-power photovoltaic farm. This time, at the request of a foreign investor in the Design and Build

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top