Zakłady Chemiczne Police S.A.

Elmont Grupa – Inwestycje przemysłowe

The comprehensive investment implementation consisting in the design, delivery, assembly and commissioning of a 6kV switchgear with a 6kV 750kW soft start motor.

Ordering party: Grupa Azoty Zakłady Chemiczne Police S.A.

Scope of works:

  • preparation of executive design documentation,
  • preparation of the room for installation of a 6kV switchgear,
  • delivery and assembly of a 6kV switchgear in building 570B,
  • execution of terminals and connection of existing 6kV cables to the feeder busbar,
  • connection of existing control cables and fibre optic line,
  • delivery, installation and connection to the switchgear a soft start system (soft start), a 6 kV 750 kW engine,
  • tests and measurements after assembly and commissioning of the switchgear,
  • providing as-built and quality documentation.

Share

See more

Farma fotowoltaiczna Elmont
Photovoltaic farms

20 MW PV farm

Elmont is starting the construction of its next high-power photovoltaic farm. This time, at the request of a foreign investor in the Design and Build

Energy infrastructure

New GIS 110kV for EON

Consortium of companies Elmont Sp. z o. o. and Pracownia Projektowa Enspro Sp. z o. o. will develop executive documentation and build a 110 kV

Photovoltaic farms

Photovoltaic farms with a total capacity 4MW

Elmont, together with Pracownia Projektowa Enspro, will design and build photovoltaic farms with a total capacity of 4 MW.The scope of work includes the preparation

See our projects